{"id":11033,"date":"2023-10-13T13:42:11","date_gmt":"2023-10-13T17:42:11","guid":{"rendered":"https:\/\/pcconstruction.com\/?p=11033"},"modified":"2023-10-13T13:51:53","modified_gmt":"2023-10-13T17:51:53","slug":"work-winds-down-at-floridas-ralph-brennan-wtp","status":"publish","type":"post","link":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/","title":{"rendered":"Work Winds Down at Florida\u2019s Ralph Brennan WTP"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-10961\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972.jpeg\" alt=\"\" width=\"2302\" height=\"1977\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972.jpeg 2302w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972-768x660.jpeg 768w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972-1290x1108.jpeg 1290w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972-1536x1319.jpeg 1536w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972-2048x1759.jpeg 2048w\" sizes=\"auto, (max-width: 2302px) 100vw, 2302px\" \/>Construction is now wrapping up at the Ralph Brennan Water Treatment Plant in Daytona Beach, Florida. Preconstruction on this design-build project began two years ago to upgrade the existing filter complex and replace the aging Leopold filter underdrain system. Through design, permitting and construction, the team identified and incorporated a new system capable of meeting the plant\u2019s permitted capacity of 24 mgd, extending the useful life of the facilities while promoting reliable water production and regulatory compliance.<\/p>\n<p>This is the first design-build contract for the City of Daytona Beach\u2019s utility department, and the PC team worked hand-in-hand with the owner at every step to ensure everyone understood the process that would lead the design progression and procurement for an on-time project delivery. Throughout construction, we worked closely with the City to continue to tailor the scope and make adjustments to best meet their needs at no additional cost, adding tremendous value to the resulting project.<\/p>\n<p>To meet demand, the plant had to keep five filters operating around the clock. This required close coordination with plant operations staff to ensure the invasive piping and valve installations on common pipelines shared by operational filters did not limit plant capacity. It was also crucial that the operating filters were not exposed to contamination from construction demolition and the reinstallation of filter internals on adjacent filters. PC focused on isolating the construction of the affected filter from the others in operation by building full enclosures that were inspected and maintained on a daily basis.<\/p>\n<p>Extensive MOPO and planning was required to complete the installation of the new filter equipment. The scope of work required over 45 individual shutdowns. The PC team developed a thorough understanding of the plant and its operational needs to ensure the work associated with each shutdown was completed swiftly and efficiently without impacting the required plant capacity.<\/p>\n<p>PC self-performed the majority of the of the project scope including sitework, utilities, concrete, metals and process mechanical work.<\/p>\n<p>\u201cPC has proven to be a great team player and collaborator,\u201d said Eric Smith, P.E., Deputy Utilities Director for the City of Daytona Beach. \u201cPC is highly committed to being available to City staff, spending time with operations and maintenance staff to ensure they are involved in every step of the project. They have taken the time to become intimately familiar with the facilities they work on the ensure plant operations are maintained at all times. Based on our experience with PC, and the consistent and exceptional services they have provided to the City, we have confidence that they will bring the same level of service and quality to any project they work on.\u201d<\/p>\n<p>We\u2019re excited to continue to bring this expertise and commitment to our clients in the Florida region.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-10962 size-full\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_03-scaled-e1697218868482.jpeg\" alt=\"\" width=\"1920\" height=\"1958\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_03-scaled-e1697218868482.jpeg 1920w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_03-scaled-e1697218868482-753x768.jpeg 753w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_03-scaled-e1697218868482-1265x1290.jpeg 1265w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_03-scaled-e1697218868482-768x783.jpeg 768w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_03-scaled-e1697218868482-1506x1536.jpeg 1506w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-10964 size-full\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_05-e1697218829265.jpeg\" alt=\"\" width=\"1466\" height=\"1429\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_05-e1697218829265.jpeg 1466w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_05-e1697218829265-768x749.jpeg 768w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_05-e1697218829265-1290x1257.jpeg 1290w\" sizes=\"auto, (max-width: 1466px) 100vw, 1466px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-10965 size-full\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_06-scaled-e1697218788587.jpeg\" alt=\"\" width=\"2310\" height=\"2028\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_06-scaled-e1697218788587.jpeg 2310w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_06-scaled-e1697218788587-768x674.jpeg 768w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_06-scaled-e1697218788587-1290x1133.jpeg 1290w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_06-scaled-e1697218788587-1536x1348.jpeg 1536w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_06-scaled-e1697218788587-2048x1798.jpeg 2048w\" sizes=\"auto, (max-width: 2310px) 100vw, 2310px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction is now wrapping up at the Ralph Brennan Water Treatment Plant in Daytona Beach, Florida. Preconstruction on this design-build project began two years ago to upgrade the existing filter complex and replace the aging Leopold filter underdrain system. Through design, permitting and construction, the team identified and incorporated a new system capable of meeting [&hellip;]<\/p>\n","protected":false},"author":65,"featured_media":10961,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[20],"tags":[32],"class_list":["post-11033","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-water-wastewater-treatment"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Work Winds Down at Florida\u2019s Ralph Brennan WTP - PC Construction<\/title>\n<meta name=\"description\" content=\"This design-build project began two years ago to upgrade the filter complex and replace the aging Leopold filter underdrain system.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Work Winds Down at Florida\u2019s Ralph Brennan WTP - PC Construction\" \/>\n<meta property=\"og:description\" content=\"This design-build project began two years ago to upgrade the filter complex and replace the aging Leopold filter underdrain system.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/\" \/>\n<meta property=\"og:site_name\" content=\"PC Construction\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pcconstructioncareers\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-13T17:42:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-13T17:51:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2302\" \/>\n\t<meta property=\"og:image:height\" content=\"1977\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"John Yesalonia, Senior Project Manager\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"John Yesalonia, Senior Project Manager\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/\"},\"author\":{\"name\":\"John Yesalonia, Senior Project Manager\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/a74a1824982736d8a713b180f5c8987b\"},\"headline\":\"Work Winds Down at Florida\u2019s Ralph Brennan WTP\",\"datePublished\":\"2023-10-13T17:42:11+00:00\",\"dateModified\":\"2023-10-13T17:51:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/\"},\"wordCount\":468,\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972.jpeg\",\"keywords\":[\"Water \/ Wastewater\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/\",\"url\":\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/\",\"name\":\"Work Winds Down at Florida\u2019s Ralph Brennan WTP - PC Construction\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972.jpeg\",\"datePublished\":\"2023-10-13T17:42:11+00:00\",\"dateModified\":\"2023-10-13T17:51:53+00:00\",\"description\":\"This design-build project began two years ago to upgrade the filter complex and replace the aging Leopold filter underdrain system.\",\"breadcrumb\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#primaryimage\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972.jpeg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972.jpeg\",\"width\":2302,\"height\":1977},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pcconstruction.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Work Winds Down at Florida\u2019s Ralph Brennan WTP\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pcconstruction.com\/#website\",\"url\":\"https:\/\/pcconstruction.com\/\",\"name\":\"PC Construction\",\"description\":\"Building Stronger, Together\",\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pcconstruction.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pcconstruction.com\/#organization\",\"name\":\"PC Construction\",\"url\":\"https:\/\/pcconstruction.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"width\":1200,\"height\":1200,\"caption\":\"PC Construction\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pcconstructioncareers\",\"https:\/\/www.linkedin.com\/company\/64818\",\"https:\/\/www.youtube.com\/pcconstructionco\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/a74a1824982736d8a713b180f5c8987b\",\"name\":\"John Yesalonia, Senior Project Manager\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d19c4af979a72b1eeee37962c59375e8ec164758b569108ee1ccea4074dd09f9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d19c4af979a72b1eeee37962c59375e8ec164758b569108ee1ccea4074dd09f9?s=96&d=mm&r=g\",\"caption\":\"John Yesalonia, Senior Project Manager\"},\"url\":\"https:\/\/pcconstruction.com\/news\/author\/jyesalonia\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Work Winds Down at Florida\u2019s Ralph Brennan WTP - PC Construction","description":"This design-build project began two years ago to upgrade the filter complex and replace the aging Leopold filter underdrain system.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/","og_locale":"en_US","og_type":"article","og_title":"Work Winds Down at Florida\u2019s Ralph Brennan WTP - PC Construction","og_description":"This design-build project began two years ago to upgrade the filter complex and replace the aging Leopold filter underdrain system.","og_url":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/","og_site_name":"PC Construction","article_publisher":"https:\/\/www.facebook.com\/pcconstructioncareers","article_published_time":"2023-10-13T17:42:11+00:00","article_modified_time":"2023-10-13T17:51:53+00:00","og_image":[{"width":2302,"height":1977,"url":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972.jpeg","type":"image\/jpeg"}],"author":"John Yesalonia, Senior Project Manager","twitter_card":"summary_large_image","twitter_misc":{"Written by":"John Yesalonia, Senior Project Manager","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#article","isPartOf":{"@id":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/"},"author":{"name":"John Yesalonia, Senior Project Manager","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/a74a1824982736d8a713b180f5c8987b"},"headline":"Work Winds Down at Florida\u2019s Ralph Brennan WTP","datePublished":"2023-10-13T17:42:11+00:00","dateModified":"2023-10-13T17:51:53+00:00","mainEntityOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/"},"wordCount":468,"publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972.jpeg","keywords":["Water \/ Wastewater"],"articleSection":["Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/","url":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/","name":"Work Winds Down at Florida\u2019s Ralph Brennan WTP - PC Construction","isPartOf":{"@id":"https:\/\/pcconstruction.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#primaryimage"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972.jpeg","datePublished":"2023-10-13T17:42:11+00:00","dateModified":"2023-10-13T17:51:53+00:00","description":"This design-build project began two years ago to upgrade the filter complex and replace the aging Leopold filter underdrain system.","breadcrumb":{"@id":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#primaryimage","url":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972.jpeg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/06\/Project_Ralph-Brennan-WTP_02a-scaled-e1697218710972.jpeg","width":2302,"height":1977},{"@type":"BreadcrumbList","@id":"https:\/\/pcconstruction.com\/news\/work-winds-down-at-floridas-ralph-brennan-wtp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pcconstruction.com\/"},{"@type":"ListItem","position":2,"name":"Work Winds Down at Florida\u2019s Ralph Brennan WTP"}]},{"@type":"WebSite","@id":"https:\/\/pcconstruction.com\/#website","url":"https:\/\/pcconstruction.com\/","name":"PC Construction","description":"Building Stronger, Together","publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pcconstruction.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pcconstruction.com\/#organization","name":"PC Construction","url":"https:\/\/pcconstruction.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/","url":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","width":1200,"height":1200,"caption":"PC Construction"},"image":{"@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pcconstructioncareers","https:\/\/www.linkedin.com\/company\/64818","https:\/\/www.youtube.com\/pcconstructionco\/"]},{"@type":"Person","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/a74a1824982736d8a713b180f5c8987b","name":"John Yesalonia, Senior Project Manager","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d19c4af979a72b1eeee37962c59375e8ec164758b569108ee1ccea4074dd09f9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d19c4af979a72b1eeee37962c59375e8ec164758b569108ee1ccea4074dd09f9?s=96&d=mm&r=g","caption":"John Yesalonia, Senior Project Manager"},"url":"https:\/\/pcconstruction.com\/news\/author\/jyesalonia\/"}]}},"_links":{"self":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/11033","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/users\/65"}],"replies":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/comments?post=11033"}],"version-history":[{"count":5,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/11033\/revisions"}],"predecessor-version":[{"id":11045,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/11033\/revisions\/11045"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media\/10961"}],"wp:attachment":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media?parent=11033"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/categories?post=11033"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/tags?post=11033"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}