{"id":11179,"date":"2023-11-10T13:28:00","date_gmt":"2023-11-10T18:28:00","guid":{"rendered":"https:\/\/pcconstruction.com\/?p=11179"},"modified":"2023-11-10T13:47:30","modified_gmt":"2023-11-10T18:47:30","slug":"wssc-bioenergy-project-nears-construction-completion","status":"publish","type":"post","link":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/","title":{"rendered":"WSSC Bioenergy Project Nears Construction Completion"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11180 size-full\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01.jpg\" alt=\"\" width=\"2100\" height=\"1181\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01.jpg 2100w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01-768x432.jpg 768w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01-1290x725.jpg 1290w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01-1536x864.jpg 1536w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01-2048x1152.jpg 2048w\" sizes=\"auto, (max-width: 2100px) 100vw, 2100px\" \/>After three and a half years, the <a href=\"https:\/\/pcconstruction.com\/projects\/wssc-piscataway-wrrf-bio-energy-project\/\">bioenergy project<\/a> at WSSC Water\u2019s Piscataway WRRF is nearing the completion of construction. A flurry of activity is taking place to put the final pieces in place, including the combined heat and power (CHP) system, gas cleaning system, digested sludge storage tank cover and the cake receiving building.<\/p>\n<p>The CHP system consists of three 1.5 MW engine generators and three 5,000 lb\/hr steam boilers and serves multiple purposes for the project. First, the engines will generate enough power to run the entire bioenergy project and will serve as a backup power source for the entire Piscataway WRRF if there is a loss of power due to weather or other cause. The engines will also provide heat to the Medium Temperature Hot Water (MTHW) loop that runs throughout the project and supports the sidestream treatment project. The boilers will recover heat from the engines to generate steam, which will be used to supply the Cambi thermal hydrolysis process (THP).<\/p>\n<p>The gas cleaning system will take the methane generated from the two 1.5-million-gallon anaerobic digesters and remove impurities, resulting in renewable natural gas that can be fed into Washington Gas\u2019 pipeline and used in Montgomery County buses.<\/p>\n<p>The cake receiving facility is a key component of this regional facility. WSSC will haul biosolids from their four other treatment facilities and, as the name implies, the cake receiving facility is where trucks will deliver the biosolids material. The cake receiving facility consists of two large storage bins, two hoppers that hold the solids as they are transferred from the trucks and several pumps that transfer the biosolids. The pre-engineered metal building encloses the hoppers to mitigate any potential odors. As trucks approach the building, a large door opens, allowing the truck to dump material into the hopper. Once the truck is empty, the large door closes.<\/p>\n<p>The digested sludge storage tank (DSST) is a converted 55-foot gravity thickening tank that was no longer needed. A cover consisting of 24 steel \u201cwedges\u201d was assembled, welded and painted on site. The assembled cover was then lifted and placed on the new digested sludge storage tank. The DSST provides additional storage for sludge before it is sent to the post-dewatering belt filter presses. This additional storage provides the plant operators flexibility in managing the overall flow of the plant.<\/p>\n<p>This project has been exciting from the start and now, as major construction activities start to wind down, we\u2019ll get to see all the new processes in action. Stay tuned in the coming months for updates on the start-up of this state-of-the-art facility for WSSC Water.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11183 size-full\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_04.jpg\" alt=\"WSSC Piscataway Bioenergy project gas handling upgrades, flare and storage\" width=\"2100\" height=\"1313\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_04.jpg 2100w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_04-768x480.jpg 768w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_04-1290x807.jpg 1290w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_04-1536x960.jpg 1536w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_04-2048x1280.jpg 2048w\" sizes=\"auto, (max-width: 2100px) 100vw, 2100px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11182 size-full\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_03-scaled.jpg\" alt=\"WSSC Piscataway Bioenergy project central heat and power and gas upgrades\" width=\"2560\" height=\"1483\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_03-scaled.jpg 2560w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_03-768x445.jpg 768w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_03-1290x747.jpg 1290w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_03-1536x890.jpg 1536w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_03-2048x1186.jpg 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11181 size-full\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_02.jpg\" alt=\"WSSC Piscataway Bioenergy project cake receiving\" width=\"2100\" height=\"1414\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_02.jpg 2100w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_02-768x517.jpg 768w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_02-1290x869.jpg 1290w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_02-1536x1034.jpg 1536w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_02-2048x1379.jpg 2048w\" sizes=\"auto, (max-width: 2100px) 100vw, 2100px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-11184 size-full\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_05.jpg\" alt=\"WSSC Piscataway Bioenergy project digester sludge storage tank cover\" width=\"2100\" height=\"1345\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_05.jpg 2100w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_05-768x492.jpg 768w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_05-1290x826.jpg 1290w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_05-1536x984.jpg 1536w, https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_05-2048x1312.jpg 2048w\" sizes=\"auto, (max-width: 2100px) 100vw, 2100px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>After three and a half years, the bioenergy project at WSSC Water\u2019s Piscataway WRRF is nearing the completion of construction. A flurry of activity is taking place to put the final pieces in place, including the combined heat and power (CHP) system, gas cleaning system, digested sludge storage tank cover and the cake receiving building. [&hellip;]<\/p>\n","protected":false},"author":13,"featured_media":11180,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[20],"tags":[32],"class_list":["post-11179","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-water-wastewater-treatment"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>WSSC Bioenergy Project Nears Construction Completion - PC Construction<\/title>\n<meta name=\"description\" content=\"The bioenergy project at WSSC\u2019s Piscataway WRRF is nearing the completion. Current work includes the combined heat and power (CHP) and gas cleaning systems.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"WSSC Bioenergy Project Nears Construction Completion - PC Construction\" \/>\n<meta property=\"og:description\" content=\"The bioenergy project at WSSC\u2019s Piscataway WRRF is nearing the completion. Current work includes the combined heat and power (CHP) and gas cleaning systems.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/\" \/>\n<meta property=\"og:site_name\" content=\"PC Construction\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pcconstructioncareers\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-10T18:28:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-11-10T18:47:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2100\" \/>\n\t<meta property=\"og:image:height\" content=\"1181\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Laura Simmers, Design-Build Process Manager\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Laura Simmers, Design-Build Process Manager\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/\"},\"author\":{\"name\":\"Laura Simmers, Design-Build Process Manager\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/99568ed7437a04f44855bdce21765a49\"},\"headline\":\"WSSC Bioenergy Project Nears Construction Completion\",\"datePublished\":\"2023-11-10T18:28:00+00:00\",\"dateModified\":\"2023-11-10T18:47:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/\"},\"wordCount\":442,\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01.jpg\",\"keywords\":[\"Water \/ Wastewater\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/\",\"url\":\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/\",\"name\":\"WSSC Bioenergy Project Nears Construction Completion - PC Construction\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01.jpg\",\"datePublished\":\"2023-11-10T18:28:00+00:00\",\"dateModified\":\"2023-11-10T18:47:30+00:00\",\"description\":\"The bioenergy project at WSSC\u2019s Piscataway WRRF is nearing the completion. Current work includes the combined heat and power (CHP) and gas cleaning systems.\",\"breadcrumb\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#primaryimage\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01.jpg\",\"width\":2100,\"height\":1181,\"caption\":\"WSSC Piscataway Bioenergy project aerial\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pcconstruction.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"WSSC Bioenergy Project Nears Construction Completion\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pcconstruction.com\/#website\",\"url\":\"https:\/\/pcconstruction.com\/\",\"name\":\"PC Construction\",\"description\":\"Building Stronger, Together\",\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pcconstruction.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pcconstruction.com\/#organization\",\"name\":\"PC Construction\",\"url\":\"https:\/\/pcconstruction.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"width\":1200,\"height\":1200,\"caption\":\"PC Construction\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pcconstructioncareers\",\"https:\/\/www.linkedin.com\/company\/64818\",\"https:\/\/www.youtube.com\/pcconstructionco\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/99568ed7437a04f44855bdce21765a49\",\"name\":\"Laura Simmers, Design-Build Process Manager\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7d88afe217faf20d9a28e84bdf0a970a44cc64b0f430875e973c685dbeaf761a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7d88afe217faf20d9a28e84bdf0a970a44cc64b0f430875e973c685dbeaf761a?s=96&d=mm&r=g\",\"caption\":\"Laura Simmers, Design-Build Process Manager\"},\"url\":\"https:\/\/pcconstruction.com\/news\/author\/lsimmers\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"WSSC Bioenergy Project Nears Construction Completion - PC Construction","description":"The bioenergy project at WSSC\u2019s Piscataway WRRF is nearing the completion. Current work includes the combined heat and power (CHP) and gas cleaning systems.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/","og_locale":"en_US","og_type":"article","og_title":"WSSC Bioenergy Project Nears Construction Completion - PC Construction","og_description":"The bioenergy project at WSSC\u2019s Piscataway WRRF is nearing the completion. Current work includes the combined heat and power (CHP) and gas cleaning systems.","og_url":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/","og_site_name":"PC Construction","article_publisher":"https:\/\/www.facebook.com\/pcconstructioncareers","article_published_time":"2023-11-10T18:28:00+00:00","article_modified_time":"2023-11-10T18:47:30+00:00","og_image":[{"width":2100,"height":1181,"url":"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01.jpg","type":"image\/jpeg"}],"author":"Laura Simmers, Design-Build Process Manager","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Laura Simmers, Design-Build Process Manager","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#article","isPartOf":{"@id":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/"},"author":{"name":"Laura Simmers, Design-Build Process Manager","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/99568ed7437a04f44855bdce21765a49"},"headline":"WSSC Bioenergy Project Nears Construction Completion","datePublished":"2023-11-10T18:28:00+00:00","dateModified":"2023-11-10T18:47:30+00:00","mainEntityOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/"},"wordCount":442,"publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01.jpg","keywords":["Water \/ Wastewater"],"articleSection":["Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/","url":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/","name":"WSSC Bioenergy Project Nears Construction Completion - PC Construction","isPartOf":{"@id":"https:\/\/pcconstruction.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#primaryimage"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01.jpg","datePublished":"2023-11-10T18:28:00+00:00","dateModified":"2023-11-10T18:47:30+00:00","description":"The bioenergy project at WSSC\u2019s Piscataway WRRF is nearing the completion. Current work includes the combined heat and power (CHP) and gas cleaning systems.","breadcrumb":{"@id":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#primaryimage","url":"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2023\/11\/Blog_WSSCProgress2023_01.jpg","width":2100,"height":1181,"caption":"WSSC Piscataway Bioenergy project aerial"},{"@type":"BreadcrumbList","@id":"https:\/\/pcconstruction.com\/news\/wssc-bioenergy-project-nears-construction-completion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pcconstruction.com\/"},{"@type":"ListItem","position":2,"name":"WSSC Bioenergy Project Nears Construction Completion"}]},{"@type":"WebSite","@id":"https:\/\/pcconstruction.com\/#website","url":"https:\/\/pcconstruction.com\/","name":"PC Construction","description":"Building Stronger, Together","publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pcconstruction.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pcconstruction.com\/#organization","name":"PC Construction","url":"https:\/\/pcconstruction.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/","url":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","width":1200,"height":1200,"caption":"PC Construction"},"image":{"@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pcconstructioncareers","https:\/\/www.linkedin.com\/company\/64818","https:\/\/www.youtube.com\/pcconstructionco\/"]},{"@type":"Person","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/99568ed7437a04f44855bdce21765a49","name":"Laura Simmers, Design-Build Process Manager","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7d88afe217faf20d9a28e84bdf0a970a44cc64b0f430875e973c685dbeaf761a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7d88afe217faf20d9a28e84bdf0a970a44cc64b0f430875e973c685dbeaf761a?s=96&d=mm&r=g","caption":"Laura Simmers, Design-Build Process Manager"},"url":"https:\/\/pcconstruction.com\/news\/author\/lsimmers\/"}]}},"_links":{"self":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/11179","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/comments?post=11179"}],"version-history":[{"count":5,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/11179\/revisions"}],"predecessor-version":[{"id":11191,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/11179\/revisions\/11191"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media\/11180"}],"wp:attachment":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media?parent=11179"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/categories?post=11179"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/tags?post=11179"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}