{"id":12199,"date":"2024-11-12T13:12:04","date_gmt":"2024-11-12T18:12:04","guid":{"rendered":"https:\/\/pcconstruction.com\/?p=12199"},"modified":"2024-11-12T13:12:04","modified_gmt":"2024-11-12T18:12:04","slug":"pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility","status":"publish","type":"post","link":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/","title":{"rendered":"PC Construction, Stantec, and Hazen and Sawyer Complete WSSC Water\u2019s $271M Piscataway Bioenergy Facility"},"content":{"rendered":"<figure id=\"attachment_12200\" aria-describedby=\"caption-attachment-12200\" style=\"width: 768px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-12200\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-768x528.jpg\" alt=\"\" width=\"768\" height=\"528\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-768x528.jpg 768w, https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-1290x887.jpg 1290w, https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-1536x1056.jpg 1536w, https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-2048x1408.jpg 2048w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><figcaption id=\"caption-attachment-12200\" class=\"wp-caption-text\">default<\/figcaption><\/figure>\n<p><strong><em>Project will boost green energy capabilities, save customers money, and reduce greenhouse gas emissions<\/em><\/strong><\/p>\n<p>Accokeek, MD \u2013 The design-build team of PC Construction, Stantec, and Hazen and Sawyer are excited to announce the completion of construction for WSSC Water\u2019s $271 million Piscataway Bioenergy Facility in Prince George\u2019s County, Maryland, where biosolids will be turned into green energy. The facility is projected to generate approximately $4 million per year in revenue, save WSSC Water customers approximately $3.4 million per year in operating costs, and further reduce WSSC Water\u2019s greenhouse gas emissions.<\/p>\n<p>This is the largest and most technically advanced project WSSC Water has constructed in its 106-year history and is one of only seven in the country to incorporate an advanced Thermal Hydrolysis Process (THP) to efficiently transform biosolids. Once fully operational in early 2025, all biosolids from WSSC Water\u2019s six water resource recovery facilities will be delivered to the new facility for processing, transforming how Maryland\u2019s largest water utility handles biosolids.<\/p>\n<p>\u201cThis project is truly groundbreaking, utilizing the thermal hydrolysis technology to reduce costs and increase efficiency and sustainability,\u201d said Matt Cooke, President and CEO at PC Construction. \u201cI am so grateful for the exceptional team that came together to deliver this innovative project \u2013 from our collaborative partnership with WSSC Water and the design-build team who leads the industry in designing and constructing these specialized facilities, to the more than 120 subcontractors and vendors and hundreds of skilled craft workers who brought their best work to the site every day.\u201d<\/p>\n<p>The facility, which was completed by a design-build team led by PC Construction in partnership with Stantec and Hazen and Sawyer, converts wastewater biosolids into biogas, which is then used by Combined Heat and Power (CHP) engines to help power the facility, with a portion of the bioenergy generated being sold to Montgomery County to power part of its Ride On bus fleet. In addition, the facility will produce fewer and cleaner biosolids \u2013 Class A biosolids \u2013 that can be marketed as a soil amendment.<\/p>\n<p>\u201cThis has been an innovative and ambitious effort from the start, with hundreds of engineers and scientists contributing over the course of the project,\u201d said Joe Uglevich, senior vice president and director of water delivery at Stantec. \u201cReaching this critical completion milestone is deeply rewarding for the entire team. This was a massive undertaking, and we are grateful for the opportunity to work alongside PC Construction to achieve WSSC Water\u2019s vision and design this incredible facility.\u201d<\/p>\n<p>The design and construction of the facility supported hundreds of skilled craft workers, with participation by 34 Minority Business Enterprises (MBE) and Small Local Business Enterprises (SLBE), supporting nearly 150 MBE\/SLBE jobs.<\/p>\n<p>Construction was completed on budget and on schedule, providing a regional facility capable of treating up to 92 dry tons of biosolids per day.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project will boost green energy capabilities, save customers money, and reduce greenhouse gas emissions Accokeek, MD \u2013 The design-build team of PC Construction, Stantec, and Hazen and Sawyer are excited to announce the completion of construction for WSSC Water\u2019s $271 million Piscataway Bioenergy Facility in Prince George\u2019s County, Maryland, where biosolids will be turned into [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":12200,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[32],"class_list":["post-12199","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-releases","tag-water-wastewater-treatment"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>PC Construction, Stantec, and Hazen and Sawyer Complete WSSC Water\u2019s $271M Piscataway Bioenergy Facility - PC Construction<\/title>\n<meta name=\"description\" content=\"PC Construction announces the completion of construction for WSSC Water\u2019s $271 million Piscataway Bioenergy Facility in Prince George\u2019s County, Maryland, where biosolids will be turned into green energy.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PC Construction, Stantec, and Hazen and Sawyer Complete WSSC Water\u2019s $271M Piscataway Bioenergy Facility - PC Construction\" \/>\n<meta property=\"og:description\" content=\"PC Construction announces the completion of construction for WSSC Water\u2019s $271 million Piscataway Bioenergy Facility in Prince George\u2019s County, Maryland, where biosolids will be turned into green energy.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/\" \/>\n<meta property=\"og:site_name\" content=\"PC Construction\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pcconstructioncareers\" \/>\n<meta property=\"article:published_time\" content=\"2024-11-12T18:12:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1760\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"PC Construction\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"PC Construction\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/\"},\"author\":{\"name\":\"PC Construction\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/65cd167028ea5f5f3950e97ebca2227a\"},\"headline\":\"PC Construction, Stantec, and Hazen and Sawyer Complete WSSC Water\u2019s $271M Piscataway Bioenergy Facility\",\"datePublished\":\"2024-11-12T18:12:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/\"},\"wordCount\":487,\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-scaled.jpg\",\"keywords\":[\"Water \/ Wastewater\"],\"articleSection\":[\"Press Releases\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/\",\"url\":\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/\",\"name\":\"PC Construction, Stantec, and Hazen and Sawyer Complete WSSC Water\u2019s $271M Piscataway Bioenergy Facility - PC Construction\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-scaled.jpg\",\"datePublished\":\"2024-11-12T18:12:04+00:00\",\"description\":\"PC Construction announces the completion of construction for WSSC Water\u2019s $271 million Piscataway Bioenergy Facility in Prince George\u2019s County, Maryland, where biosolids will be turned into green energy.\",\"breadcrumb\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#primaryimage\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-scaled.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-scaled.jpg\",\"width\":2560,\"height\":1760,\"caption\":\"default\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pcconstruction.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PC Construction, Stantec, and Hazen and Sawyer Complete WSSC Water\u2019s $271M Piscataway Bioenergy Facility\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pcconstruction.com\/#website\",\"url\":\"https:\/\/pcconstruction.com\/\",\"name\":\"PC Construction\",\"description\":\"Building Stronger, Together\",\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pcconstruction.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pcconstruction.com\/#organization\",\"name\":\"PC Construction\",\"url\":\"https:\/\/pcconstruction.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"width\":1200,\"height\":1200,\"caption\":\"PC Construction\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pcconstructioncareers\",\"https:\/\/www.linkedin.com\/company\/64818\",\"https:\/\/www.youtube.com\/pcconstructionco\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/65cd167028ea5f5f3950e97ebca2227a\",\"name\":\"PC Construction\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6acc65248f2825d4f70ecb3d28893dae2a41b1b29993ad77111e1538c59a89e0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/6acc65248f2825d4f70ecb3d28893dae2a41b1b29993ad77111e1538c59a89e0?s=96&d=mm&r=g\",\"caption\":\"PC Construction\"},\"url\":\"https:\/\/pcconstruction.com\/news\/author\/pcconstruction\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PC Construction, Stantec, and Hazen and Sawyer Complete WSSC Water\u2019s $271M Piscataway Bioenergy Facility - PC Construction","description":"PC Construction announces the completion of construction for WSSC Water\u2019s $271 million Piscataway Bioenergy Facility in Prince George\u2019s County, Maryland, where biosolids will be turned into green energy.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/","og_locale":"en_US","og_type":"article","og_title":"PC Construction, Stantec, and Hazen and Sawyer Complete WSSC Water\u2019s $271M Piscataway Bioenergy Facility - PC Construction","og_description":"PC Construction announces the completion of construction for WSSC Water\u2019s $271 million Piscataway Bioenergy Facility in Prince George\u2019s County, Maryland, where biosolids will be turned into green energy.","og_url":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/","og_site_name":"PC Construction","article_publisher":"https:\/\/www.facebook.com\/pcconstructioncareers","article_published_time":"2024-11-12T18:12:04+00:00","og_image":[{"width":2560,"height":1760,"url":"https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-scaled.jpg","type":"image\/jpeg"}],"author":"PC Construction","twitter_card":"summary_large_image","twitter_misc":{"Written by":"PC Construction","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#article","isPartOf":{"@id":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/"},"author":{"name":"PC Construction","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/65cd167028ea5f5f3950e97ebca2227a"},"headline":"PC Construction, Stantec, and Hazen and Sawyer Complete WSSC Water\u2019s $271M Piscataway Bioenergy Facility","datePublished":"2024-11-12T18:12:04+00:00","mainEntityOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/"},"wordCount":487,"publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-scaled.jpg","keywords":["Water \/ Wastewater"],"articleSection":["Press Releases"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/","url":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/","name":"PC Construction, Stantec, and Hazen and Sawyer Complete WSSC Water\u2019s $271M Piscataway Bioenergy Facility - PC Construction","isPartOf":{"@id":"https:\/\/pcconstruction.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#primaryimage"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-scaled.jpg","datePublished":"2024-11-12T18:12:04+00:00","description":"PC Construction announces the completion of construction for WSSC Water\u2019s $271 million Piscataway Bioenergy Facility in Prince George\u2019s County, Maryland, where biosolids will be turned into green energy.","breadcrumb":{"@id":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#primaryimage","url":"https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-scaled.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2024\/11\/WSSC-Piscataway-Bioenergy-Facility-scaled.jpg","width":2560,"height":1760,"caption":"default"},{"@type":"BreadcrumbList","@id":"https:\/\/pcconstruction.com\/news\/pc-construction-stantec-and-hazen-and-sawyer-complete-wssc-waters-271m-piscataway-bioenergy-facility\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pcconstruction.com\/"},{"@type":"ListItem","position":2,"name":"PC Construction, Stantec, and Hazen and Sawyer Complete WSSC Water\u2019s $271M Piscataway Bioenergy Facility"}]},{"@type":"WebSite","@id":"https:\/\/pcconstruction.com\/#website","url":"https:\/\/pcconstruction.com\/","name":"PC Construction","description":"Building Stronger, Together","publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pcconstruction.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pcconstruction.com\/#organization","name":"PC Construction","url":"https:\/\/pcconstruction.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/","url":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","width":1200,"height":1200,"caption":"PC Construction"},"image":{"@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pcconstructioncareers","https:\/\/www.linkedin.com\/company\/64818","https:\/\/www.youtube.com\/pcconstructionco\/"]},{"@type":"Person","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/65cd167028ea5f5f3950e97ebca2227a","name":"PC Construction","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/6acc65248f2825d4f70ecb3d28893dae2a41b1b29993ad77111e1538c59a89e0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6acc65248f2825d4f70ecb3d28893dae2a41b1b29993ad77111e1538c59a89e0?s=96&d=mm&r=g","caption":"PC Construction"},"url":"https:\/\/pcconstruction.com\/news\/author\/pcconstruction\/"}]}},"_links":{"self":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/12199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/comments?post=12199"}],"version-history":[{"count":1,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/12199\/revisions"}],"predecessor-version":[{"id":12201,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/12199\/revisions\/12201"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media\/12200"}],"wp:attachment":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media?parent=12199"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/categories?post=12199"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/tags?post=12199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}