{"id":5634,"date":"2017-08-03T15:22:47","date_gmt":"2017-08-03T19:22:47","guid":{"rendered":"https:\/\/www.pcconstruction.com\/blog\/?p=5634"},"modified":"2022-06-07T09:39:46","modified_gmt":"2022-06-07T13:39:46","slug":"construction-complete-on-uvm-central-plant-expansion","status":"publish","type":"post","link":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/","title":{"rendered":"Construction Complete on UVM Central Plant Expansion"},"content":{"rendered":"<p><a href=\"https:\/\/pcconstruction.com\/app\/uploads\/2017\/08\/IMG_20170802_122906.jpg\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-7583\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01.jpg\" alt=\"Brick Building with Architectural Glass Window\" width=\"1024\" height=\"642\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01.jpg 1024w, https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01-768x482.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a>Yesterday the University of Vermont hosted an open house to celebrate the completion of their Central Plant Chiller Expansion project. The $9 million four-story chiller expansion includes a 1500-ton York chiller and associated chilled water and condenser water piping. The project also features new electrical switchgear and underground ductbanks as part of electrical infrastructure upgrades for the plant. A new masonry wall encloses existing and new cooling towers and transformers, hiding the mechanical equipment within its curved walls and absorbing sound with its acoustical panels. The new addition features a large decorative arched window above the main entrance, which replicates the existing windows.<\/p>\n<p>The extensive site work included a 24-conduit duct bank with 4-inch PVC conduits for the new electrical primary supply. This work was carefully orchestrated due to its proximity to the front of the existing building and the many lines that already fed into the building. Associated shutdowns and were carefully cautiously planned to eliminate power interruption to UVM\u2019s theatre and library.<\/p>\n<p>PC Construction and 20 subcontractors worked with the design team of Charney Architects LLC, RMF Engineering and Dubois &amp; King on the construction of the chiller expansion. Construction began in early 2016 and the new chiller was operational by mid-May 2017.<\/p>\n<p>The central plant, built in 1915, is nicknamed \u201cThe Cage\u201d due to its previous use as an indoor baseball batting cage. The plant generates and distributes steam and chilled water to meet the campus needs for space heating and air conditioning, hot water generation and scientific research support.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Yesterday the University of Vermont hosted an open house to celebrate the completion of their Central Plant Chiller Expansion project. The $9 million four-story chiller expansion includes a 1500-ton York chiller and associated chilled water and condenser water piping. The project also features new electrical switchgear and underground ductbanks as part of electrical infrastructure upgrades [&hellip;]<\/p>\n","protected":false},"author":31,"featured_media":7583,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[20],"tags":[21],"class_list":["post-5634","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-education-campus"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Construction Complete on UVM Central Plant Expansion - PC Construction<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Complete on UVM Central Plant Expansion - PC Construction\" \/>\n<meta property=\"og:description\" content=\"Yesterday the University of Vermont hosted an open house to celebrate the completion of their Central Plant Chiller Expansion project. The $9 million four-story chiller expansion includes a 1500-ton York chiller and associated chilled water and condenser water piping. The project also features new electrical switchgear and underground ductbanks as part of electrical infrastructure upgrades [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/\" \/>\n<meta property=\"og:site_name\" content=\"PC Construction\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pcconstructioncareers\" \/>\n<meta property=\"article:published_time\" content=\"2017-08-03T19:22:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-07T13:39:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"642\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"John Lavoie, Senior Superintendent\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"John Lavoie, Senior Superintendent\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/\"},\"author\":{\"name\":\"John Lavoie, Senior Superintendent\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/50d4e4b67a9f8b61f8422ee1205f86b4\"},\"headline\":\"Construction Complete on UVM Central Plant Expansion\",\"datePublished\":\"2017-08-03T19:22:47+00:00\",\"dateModified\":\"2022-06-07T13:39:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/\"},\"wordCount\":256,\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01.jpg\",\"keywords\":[\"Education \/ Campus\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/\",\"url\":\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/\",\"name\":\"Construction Complete on UVM Central Plant Expansion - PC Construction\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01.jpg\",\"datePublished\":\"2017-08-03T19:22:47+00:00\",\"dateModified\":\"2022-06-07T13:39:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#primaryimage\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01.jpg\",\"width\":1024,\"height\":642,\"caption\":\"Brick Building with Architectural Glass Window\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pcconstruction.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Complete on UVM Central Plant Expansion\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pcconstruction.com\/#website\",\"url\":\"https:\/\/pcconstruction.com\/\",\"name\":\"PC Construction\",\"description\":\"Building Stronger, Together\",\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pcconstruction.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pcconstruction.com\/#organization\",\"name\":\"PC Construction\",\"url\":\"https:\/\/pcconstruction.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"width\":1200,\"height\":1200,\"caption\":\"PC Construction\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pcconstructioncareers\",\"https:\/\/www.linkedin.com\/company\/64818\",\"https:\/\/www.youtube.com\/pcconstructionco\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/50d4e4b67a9f8b61f8422ee1205f86b4\",\"name\":\"John Lavoie, Senior Superintendent\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/cc8bfbdbc004955165484319ecd84ea29ee499786d99fa1d5252d3d4ff5fe13c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/cc8bfbdbc004955165484319ecd84ea29ee499786d99fa1d5252d3d4ff5fe13c?s=96&d=mm&r=g\",\"caption\":\"John Lavoie, Senior Superintendent\"},\"url\":\"https:\/\/pcconstruction.com\/news\/author\/jlavoie\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Complete on UVM Central Plant Expansion - PC Construction","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/","og_locale":"en_US","og_type":"article","og_title":"Construction Complete on UVM Central Plant Expansion - PC Construction","og_description":"Yesterday the University of Vermont hosted an open house to celebrate the completion of their Central Plant Chiller Expansion project. The $9 million four-story chiller expansion includes a 1500-ton York chiller and associated chilled water and condenser water piping. The project also features new electrical switchgear and underground ductbanks as part of electrical infrastructure upgrades [&hellip;]","og_url":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/","og_site_name":"PC Construction","article_publisher":"https:\/\/www.facebook.com\/pcconstructioncareers","article_published_time":"2017-08-03T19:22:47+00:00","article_modified_time":"2022-06-07T13:39:46+00:00","og_image":[{"width":1024,"height":642,"url":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01.jpg","type":"image\/jpeg"}],"author":"John Lavoie, Senior Superintendent","twitter_card":"summary_large_image","twitter_misc":{"Written by":"John Lavoie, Senior Superintendent","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#article","isPartOf":{"@id":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/"},"author":{"name":"John Lavoie, Senior Superintendent","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/50d4e4b67a9f8b61f8422ee1205f86b4"},"headline":"Construction Complete on UVM Central Plant Expansion","datePublished":"2017-08-03T19:22:47+00:00","dateModified":"2022-06-07T13:39:46+00:00","mainEntityOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/"},"wordCount":256,"publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01.jpg","keywords":["Education \/ Campus"],"articleSection":["Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/","url":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/","name":"Construction Complete on UVM Central Plant Expansion - PC Construction","isPartOf":{"@id":"https:\/\/pcconstruction.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#primaryimage"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01.jpg","datePublished":"2017-08-03T19:22:47+00:00","dateModified":"2022-06-07T13:39:46+00:00","breadcrumb":{"@id":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#primaryimage","url":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_UVM-Central-Plant-Chiller-Upgrade_01.jpg","width":1024,"height":642,"caption":"Brick Building with Architectural Glass Window"},{"@type":"BreadcrumbList","@id":"https:\/\/pcconstruction.com\/news\/construction-complete-on-uvm-central-plant-expansion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pcconstruction.com\/"},{"@type":"ListItem","position":2,"name":"Construction Complete on UVM Central Plant Expansion"}]},{"@type":"WebSite","@id":"https:\/\/pcconstruction.com\/#website","url":"https:\/\/pcconstruction.com\/","name":"PC Construction","description":"Building Stronger, Together","publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pcconstruction.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pcconstruction.com\/#organization","name":"PC Construction","url":"https:\/\/pcconstruction.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/","url":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","width":1200,"height":1200,"caption":"PC Construction"},"image":{"@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pcconstructioncareers","https:\/\/www.linkedin.com\/company\/64818","https:\/\/www.youtube.com\/pcconstructionco\/"]},{"@type":"Person","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/50d4e4b67a9f8b61f8422ee1205f86b4","name":"John Lavoie, Senior Superintendent","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/cc8bfbdbc004955165484319ecd84ea29ee499786d99fa1d5252d3d4ff5fe13c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/cc8bfbdbc004955165484319ecd84ea29ee499786d99fa1d5252d3d4ff5fe13c?s=96&d=mm&r=g","caption":"John Lavoie, Senior Superintendent"},"url":"https:\/\/pcconstruction.com\/news\/author\/jlavoie\/"}]}},"_links":{"self":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/5634","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/users\/31"}],"replies":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/comments?post=5634"}],"version-history":[{"count":1,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/5634\/revisions"}],"predecessor-version":[{"id":9416,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/5634\/revisions\/9416"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media\/7583"}],"wp:attachment":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media?parent=5634"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/categories?post=5634"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/tags?post=5634"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}