{"id":6136,"date":"2019-07-01T21:05:11","date_gmt":"2019-07-02T01:05:11","guid":{"rendered":"https:\/\/www.pcconstruction.com\/blog\/?p=6136"},"modified":"2022-06-03T14:18:58","modified_gmt":"2022-06-03T18:18:58","slug":"dutchland-tank-installation-showcased-at-lynchburg-wwtp","status":"publish","type":"post","link":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/","title":{"rendered":"Dutchland Tank Installation Showcased at Lynchburg WWTP"},"content":{"rendered":"<p class=\"MsoNormal\"><a href=\"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-6137 size-full\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227.jpg\" alt=\"\" width=\"1200\" height=\"759\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227.jpg 1200w, https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227-768x486.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a>Last Wednesday, our construction team onsite at the Lynchburg Wastewater Treatment Plant hosted a Hard Hat Luncheon to celebrate and showcase the installation of the four-million-gallon precast post-tensioned combined sewer overflow tank for the City of Lynchburg. The event was sponsored by Dutchland, PC Construction\u2019s subcontractor on the project.<\/p>\n<p class=\"MsoNormal\">The Dutchland tank at the Lynchburg site measures approximately 172 feet by 127 feet with wall heights ranging between 29 feet and 34 feet. To accommodate the tank\u2019s location within a flood plain, the cast-in-place concrete slab for the tank incorporates rock anchors to resist buoyancy during rain events.<\/p>\n<p class=\"MsoNormal\">The entire tank will be set in 11 days with one panel being erected every 15 minutes during the daily installation timeframe. Upon completion of testing, the structure will accept and store up to four million gallons of combined sewer overflow during significant rain events. As the plant can accept the increased volume, the fluid will flow by gravity from the tank to the wastewater treatment plant for processing before release into the river. In the past, if the plant exceeded capacity, the water went directly into the river without treatment.<\/p>\n<p class=\"MsoNormal\"><span style=\"font-size: inherit;\">This project is one of the City of Lynchburg\u2019s largest capital improvement projects and is part of their overall plan to address 132 overflow points within the system and eliminate 93% of the city\u2019s combined overflow issues.\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Last Wednesday, our construction team onsite at the Lynchburg Wastewater Treatment Plant hosted a Hard Hat Luncheon to celebrate and showcase the installation of the four-million-gallon precast post-tensioned combined sewer overflow tank for the City of Lynchburg. The event was sponsored by Dutchland, PC Construction\u2019s subcontractor on the project. The Dutchland tank at the Lynchburg [&hellip;]<\/p>\n","protected":false},"author":47,"featured_media":6137,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[20],"tags":[32],"class_list":["post-6136","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-water-wastewater-treatment"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Dutchland Tank Installation Showcased at Lynchburg WWTP - PC Construction<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Dutchland Tank Installation Showcased at Lynchburg WWTP - PC Construction\" \/>\n<meta property=\"og:description\" content=\"Last Wednesday, our construction team onsite at the Lynchburg Wastewater Treatment Plant hosted a Hard Hat Luncheon to celebrate and showcase the installation of the four-million-gallon precast post-tensioned combined sewer overflow tank for the City of Lynchburg. The event was sponsored by Dutchland, PC Construction\u2019s subcontractor on the project. The Dutchland tank at the Lynchburg [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/\" \/>\n<meta property=\"og:site_name\" content=\"PC Construction\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pcconstructioncareers\" \/>\n<meta property=\"article:published_time\" content=\"2019-07-02T01:05:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-03T18:18:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"759\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Alan Parent, Senior Director of Business Development\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Alan Parent, Senior Director of Business Development\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/\"},\"author\":{\"name\":\"Alan Parent, Senior Director of Business Development\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/44fc7bd892b7fb257c6fbecfcc834247\"},\"headline\":\"Dutchland Tank Installation Showcased at Lynchburg WWTP\",\"datePublished\":\"2019-07-02T01:05:11+00:00\",\"dateModified\":\"2022-06-03T18:18:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/\"},\"wordCount\":229,\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227.jpg\",\"keywords\":[\"Water \/ Wastewater\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/\",\"url\":\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/\",\"name\":\"Dutchland Tank Installation Showcased at Lynchburg WWTP - PC Construction\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227.jpg\",\"datePublished\":\"2019-07-02T01:05:11+00:00\",\"dateModified\":\"2022-06-03T18:18:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#primaryimage\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227.jpg\",\"width\":1200,\"height\":759},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pcconstruction.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Dutchland Tank Installation Showcased at Lynchburg WWTP\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pcconstruction.com\/#website\",\"url\":\"https:\/\/pcconstruction.com\/\",\"name\":\"PC Construction\",\"description\":\"Building Stronger, Together\",\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pcconstruction.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pcconstruction.com\/#organization\",\"name\":\"PC Construction\",\"url\":\"https:\/\/pcconstruction.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"width\":1200,\"height\":1200,\"caption\":\"PC Construction\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pcconstructioncareers\",\"https:\/\/www.linkedin.com\/company\/64818\",\"https:\/\/www.youtube.com\/pcconstructionco\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/44fc7bd892b7fb257c6fbecfcc834247\",\"name\":\"Alan Parent, Senior Director of Business Development\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/52517efe95602e05ffcd9fc498d8ed93d4ff9bc50f19f5440ef72f9426f472b3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/52517efe95602e05ffcd9fc498d8ed93d4ff9bc50f19f5440ef72f9426f472b3?s=96&d=mm&r=g\",\"caption\":\"Alan Parent, Senior Director of Business Development\"},\"url\":\"https:\/\/pcconstruction.com\/news\/author\/aparent\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Dutchland Tank Installation Showcased at Lynchburg WWTP - PC Construction","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/","og_locale":"en_US","og_type":"article","og_title":"Dutchland Tank Installation Showcased at Lynchburg WWTP - PC Construction","og_description":"Last Wednesday, our construction team onsite at the Lynchburg Wastewater Treatment Plant hosted a Hard Hat Luncheon to celebrate and showcase the installation of the four-million-gallon precast post-tensioned combined sewer overflow tank for the City of Lynchburg. The event was sponsored by Dutchland, PC Construction\u2019s subcontractor on the project. The Dutchland tank at the Lynchburg [&hellip;]","og_url":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/","og_site_name":"PC Construction","article_publisher":"https:\/\/www.facebook.com\/pcconstructioncareers","article_published_time":"2019-07-02T01:05:11+00:00","article_modified_time":"2022-06-03T18:18:58+00:00","og_image":[{"width":1200,"height":759,"url":"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227.jpg","type":"image\/jpeg"}],"author":"Alan Parent, Senior Director of Business Development","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Alan Parent, Senior Director of Business Development","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#article","isPartOf":{"@id":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/"},"author":{"name":"Alan Parent, Senior Director of Business Development","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/44fc7bd892b7fb257c6fbecfcc834247"},"headline":"Dutchland Tank Installation Showcased at Lynchburg WWTP","datePublished":"2019-07-02T01:05:11+00:00","dateModified":"2022-06-03T18:18:58+00:00","mainEntityOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/"},"wordCount":229,"publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227.jpg","keywords":["Water \/ Wastewater"],"articleSection":["Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/","url":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/","name":"Dutchland Tank Installation Showcased at Lynchburg WWTP - PC Construction","isPartOf":{"@id":"https:\/\/pcconstruction.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#primaryimage"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227.jpg","datePublished":"2019-07-02T01:05:11+00:00","dateModified":"2022-06-03T18:18:58+00:00","breadcrumb":{"@id":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#primaryimage","url":"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2019\/07\/LynchburgA-e1654280288227.jpg","width":1200,"height":759},{"@type":"BreadcrumbList","@id":"https:\/\/pcconstruction.com\/news\/dutchland-tank-installation-showcased-at-lynchburg-wwtp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pcconstruction.com\/"},{"@type":"ListItem","position":2,"name":"Dutchland Tank Installation Showcased at Lynchburg WWTP"}]},{"@type":"WebSite","@id":"https:\/\/pcconstruction.com\/#website","url":"https:\/\/pcconstruction.com\/","name":"PC Construction","description":"Building Stronger, Together","publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pcconstruction.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pcconstruction.com\/#organization","name":"PC Construction","url":"https:\/\/pcconstruction.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/","url":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","width":1200,"height":1200,"caption":"PC Construction"},"image":{"@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pcconstructioncareers","https:\/\/www.linkedin.com\/company\/64818","https:\/\/www.youtube.com\/pcconstructionco\/"]},{"@type":"Person","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/44fc7bd892b7fb257c6fbecfcc834247","name":"Alan Parent, Senior Director of Business Development","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/52517efe95602e05ffcd9fc498d8ed93d4ff9bc50f19f5440ef72f9426f472b3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/52517efe95602e05ffcd9fc498d8ed93d4ff9bc50f19f5440ef72f9426f472b3?s=96&d=mm&r=g","caption":"Alan Parent, Senior Director of Business Development"},"url":"https:\/\/pcconstruction.com\/news\/author\/aparent\/"}]}},"_links":{"self":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/6136","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/users\/47"}],"replies":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/comments?post=6136"}],"version-history":[{"count":1,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/6136\/revisions"}],"predecessor-version":[{"id":9271,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/6136\/revisions\/9271"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media\/6137"}],"wp:attachment":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media?parent=6136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/categories?post=6136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/tags?post=6136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}