{"id":6545,"date":"2021-03-29T11:31:46","date_gmt":"2021-03-29T15:31:46","guid":{"rendered":"https:\/\/www.pcconstruction.com\/blog\/?p=6545"},"modified":"2022-06-03T11:26:58","modified_gmt":"2022-06-03T15:26:58","slug":"work-underway-at-manchester-wwtf","status":"publish","type":"post","link":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/","title":{"rendered":"Work Underway at Manchester WWTF"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-6546 size-full\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2021\/03\/ManchesterWWTF-e1654270010576.jpg\" alt=\"\" width=\"900\" height=\"589\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2021\/03\/ManchesterWWTF-e1654270010576.jpg 900w, https:\/\/pcconstruction.com\/app\/uploads\/2021\/03\/ManchesterWWTF-e1654270010576-768x503.jpg 768w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/p>\n<p>The Manchester Wastewater Treatment Facility Solids Train project, which began preliminary work in late January is now well underway in Manchester, New Hampshire. The $19.6 million project at northern New England\u2019s largest treatment plant includes complex upgrades and modifications to the continuous sludge wasting, sludge thickening, sludge mixing, dewatering, and dewatered cake storage processes. Ancillary upgrades include a new vactor truck receiving station, exterior odor control piping and supports, a mannich polymer unloading station, and an addition to the existing sludge and grit unloading area.<\/p>\n<p>To achieve these upgrades, the sludge thickening process will be modified. Rather than a combined thickening of both primary and secondary sludge, each type of sludge will be thickened separately. To support this new process, PC will install centrifuges, pumps, conveyors, a cake storage silo, and process piping to create a new flow path through the existing plant.<\/p>\n<p>While operations will continue to appear fairly regular on the outside of the facility, the interior will be a hub of activity, with the majority of areas receiving some level of upgrade or modification over the next two years. This requires very close coordination with plant staff, a true teamwork approach.<\/p>\n<p>Stay tuned for project updates and milestones as this project progresses!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Manchester Wastewater Treatment Facility Solids Train project, which began preliminary work in late January is now well underway in Manchester, New Hampshire. The $19.6 million project at northern New England\u2019s largest treatment plant includes complex upgrades and modifications to the continuous sludge wasting, sludge thickening, sludge mixing, dewatering, and dewatered cake storage processes. Ancillary [&hellip;]<\/p>\n","protected":false},"author":59,"featured_media":8041,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[20],"tags":[32],"class_list":["post-6545","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-water-wastewater-treatment"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Work Underway at Manchester WWTF - PC Construction<\/title>\n<meta name=\"description\" content=\"The $19.6 million project includes upgrades and modifications to the continuous sludge, dewatering, and dewatered cake storage processes.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Work Underway at Manchester WWTF - PC Construction\" \/>\n<meta property=\"og:description\" content=\"The $19.6 million project includes upgrades and modifications to the continuous sludge, dewatering, and dewatered cake storage processes.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/\" \/>\n<meta property=\"og:site_name\" content=\"PC Construction\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pcconstructioncareers\" \/>\n<meta property=\"article:published_time\" content=\"2021-03-29T15:31:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-03T15:26:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_Manchester-WWTF-Solids-Train_01.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"642\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"John Kelly, Project Manager\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"John Kelly, Project Manager\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/\"},\"author\":{\"name\":\"John Kelly, Project Manager\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/88bdef7731ae3731033a49fc0de3f81d\"},\"headline\":\"Work Underway at Manchester WWTF\",\"datePublished\":\"2021-03-29T15:31:46+00:00\",\"dateModified\":\"2022-06-03T15:26:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/\"},\"wordCount\":210,\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_Manchester-WWTF-Solids-Train_01.jpg\",\"keywords\":[\"Water \/ Wastewater\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/\",\"url\":\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/\",\"name\":\"Work Underway at Manchester WWTF - PC Construction\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_Manchester-WWTF-Solids-Train_01.jpg\",\"datePublished\":\"2021-03-29T15:31:46+00:00\",\"dateModified\":\"2022-06-03T15:26:58+00:00\",\"description\":\"The $19.6 million project includes upgrades and modifications to the continuous sludge, dewatering, and dewatered cake storage processes.\",\"breadcrumb\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#primaryimage\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_Manchester-WWTF-Solids-Train_01.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_Manchester-WWTF-Solids-Train_01.jpg\",\"width\":1024,\"height\":642,\"caption\":\"Piping\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pcconstruction.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Work Underway at Manchester WWTF\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pcconstruction.com\/#website\",\"url\":\"https:\/\/pcconstruction.com\/\",\"name\":\"PC Construction\",\"description\":\"Building Stronger, Together\",\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pcconstruction.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pcconstruction.com\/#organization\",\"name\":\"PC Construction\",\"url\":\"https:\/\/pcconstruction.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"width\":1200,\"height\":1200,\"caption\":\"PC Construction\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pcconstructioncareers\",\"https:\/\/www.linkedin.com\/company\/64818\",\"https:\/\/www.youtube.com\/pcconstructionco\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/88bdef7731ae3731033a49fc0de3f81d\",\"name\":\"John Kelly, Project Manager\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/db215230e7f14acf24425c937b0f3f84b6d20003c330a58aed7785e90db7bdce?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/db215230e7f14acf24425c937b0f3f84b6d20003c330a58aed7785e90db7bdce?s=96&d=mm&r=g\",\"caption\":\"John Kelly, Project Manager\"},\"url\":\"https:\/\/pcconstruction.com\/news\/author\/johnkelly\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Work Underway at Manchester WWTF - PC Construction","description":"The $19.6 million project includes upgrades and modifications to the continuous sludge, dewatering, and dewatered cake storage processes.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/","og_locale":"en_US","og_type":"article","og_title":"Work Underway at Manchester WWTF - PC Construction","og_description":"The $19.6 million project includes upgrades and modifications to the continuous sludge, dewatering, and dewatered cake storage processes.","og_url":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/","og_site_name":"PC Construction","article_publisher":"https:\/\/www.facebook.com\/pcconstructioncareers","article_published_time":"2021-03-29T15:31:46+00:00","article_modified_time":"2022-06-03T15:26:58+00:00","og_image":[{"width":1024,"height":642,"url":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_Manchester-WWTF-Solids-Train_01.jpg","type":"image\/jpeg"}],"author":"John Kelly, Project Manager","twitter_card":"summary_large_image","twitter_misc":{"Written by":"John Kelly, Project Manager","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#article","isPartOf":{"@id":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/"},"author":{"name":"John Kelly, Project Manager","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/88bdef7731ae3731033a49fc0de3f81d"},"headline":"Work Underway at Manchester WWTF","datePublished":"2021-03-29T15:31:46+00:00","dateModified":"2022-06-03T15:26:58+00:00","mainEntityOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/"},"wordCount":210,"publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_Manchester-WWTF-Solids-Train_01.jpg","keywords":["Water \/ Wastewater"],"articleSection":["Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/","url":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/","name":"Work Underway at Manchester WWTF - PC Construction","isPartOf":{"@id":"https:\/\/pcconstruction.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#primaryimage"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_Manchester-WWTF-Solids-Train_01.jpg","datePublished":"2021-03-29T15:31:46+00:00","dateModified":"2022-06-03T15:26:58+00:00","description":"The $19.6 million project includes upgrades and modifications to the continuous sludge, dewatering, and dewatered cake storage processes.","breadcrumb":{"@id":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#primaryimage","url":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_Manchester-WWTF-Solids-Train_01.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2022\/05\/Project_Manchester-WWTF-Solids-Train_01.jpg","width":1024,"height":642,"caption":"Piping"},{"@type":"BreadcrumbList","@id":"https:\/\/pcconstruction.com\/news\/work-underway-at-manchester-wwtf\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pcconstruction.com\/"},{"@type":"ListItem","position":2,"name":"Work Underway at Manchester WWTF"}]},{"@type":"WebSite","@id":"https:\/\/pcconstruction.com\/#website","url":"https:\/\/pcconstruction.com\/","name":"PC Construction","description":"Building Stronger, Together","publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pcconstruction.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pcconstruction.com\/#organization","name":"PC Construction","url":"https:\/\/pcconstruction.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/","url":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","width":1200,"height":1200,"caption":"PC Construction"},"image":{"@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pcconstructioncareers","https:\/\/www.linkedin.com\/company\/64818","https:\/\/www.youtube.com\/pcconstructionco\/"]},{"@type":"Person","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/88bdef7731ae3731033a49fc0de3f81d","name":"John Kelly, Project Manager","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/db215230e7f14acf24425c937b0f3f84b6d20003c330a58aed7785e90db7bdce?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/db215230e7f14acf24425c937b0f3f84b6d20003c330a58aed7785e90db7bdce?s=96&d=mm&r=g","caption":"John Kelly, Project Manager"},"url":"https:\/\/pcconstruction.com\/news\/author\/johnkelly\/"}]}},"_links":{"self":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/6545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/users\/59"}],"replies":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/comments?post=6545"}],"version-history":[{"count":3,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/6545\/revisions"}],"predecessor-version":[{"id":9186,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/6545\/revisions\/9186"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media\/8041"}],"wp:attachment":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media?parent=6545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/categories?post=6545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/tags?post=6545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}