{"id":6603,"date":"2021-05-14T13:06:22","date_gmt":"2021-05-14T17:06:22","guid":{"rendered":"https:\/\/www.pcconstruction.com\/blog\/?p=6603"},"modified":"2022-06-03T11:19:13","modified_gmt":"2022-06-03T15:19:13","slug":"big-changes-at-wssc-piscataway-bio-energy-project","status":"publish","type":"post","link":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/","title":{"rendered":"Big Changes at WSSC Piscataway Bio-Energy Project"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-6604 size-full\" src=\"https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102.jpg\" alt=\"\" width=\"1432\" height=\"806\" srcset=\"https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102.jpg 1432w, https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102-768x432.jpg 768w, https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102-1290x726.jpg 1290w\" sizes=\"auto, (max-width: 1432px) 100vw, 1432px\" \/>May is bringing some very visible changes to the landscape of the WSSC Piscataway Water Resource Recovery Facility. The $271 million Bio-Energy Project has been under construction for nearly a year and, with the initial site work complete, several of the project\u2019s structures have started to take shape. Most recently, we\u2019ve had 11 different subcontractors onsite.<\/p>\n<p>PC\u2019s self-perform team has set the seven belt filter presses at what will be the solids building housing all the pre- and post-dewatering activity for the facility. These are just a few of the large pieces of equipment being set into place prior to erecting the pre-cast concrete panels that will form this more than 16,000-square-foot building.<\/p>\n<p>Nitterhouse Concrete has started to place the precast panels on several buildings including the chemical storage building, sidestream pump station and gas storage blower building. They will also begin erecting the solids building once PC completes the equipment installation.<\/p>\n<p>Work continues on the two 1.5-million-gallon anaerobic digesters, including the massive cast-in-place concrete domes. Work is being completed on the structural integrity of the tanks and making them watertight through the process of wrapping and shotcreting the tanks.<\/p>\n<p>The sidestream treatment tanks are starting to take shape as well. Dutchland\u2019s team is onsite placing the foundations for the pre-cast post-tensioned tanks that will be erected in June.<\/p>\n<p>Additionally, the cake receiving vault has been completed in preparation for the cake hoppers and cake storage bins. Foundations are being prepped for the generators, boilers and gas storage facility.<\/p>\n<p>While so much has happened in the past month, the flurry of activity won\u2019t end anytime soon. Stay tuned for more updates coming soon!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>May is bringing some very visible changes to the landscape of the WSSC Piscataway Water Resource Recovery Facility. The $271 million Bio-Energy Project has been under construction for nearly a year and, with the initial site work complete, several of the project\u2019s structures have started to take shape. Most recently, we\u2019ve had 11 different subcontractors [&hellip;]<\/p>\n","protected":false},"author":52,"featured_media":6604,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[20],"tags":[38,32],"class_list":["post-6603","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-design-build","tag-water-wastewater-treatment"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Big Changes at WSSC Piscataway Bio-Energy Project - PC Construction<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Big Changes at WSSC Piscataway Bio-Energy Project - PC Construction\" \/>\n<meta property=\"og:description\" content=\"May is bringing some very visible changes to the landscape of the WSSC Piscataway Water Resource Recovery Facility. The $271 million Bio-Energy Project has been under construction for nearly a year and, with the initial site work complete, several of the project\u2019s structures have started to take shape. Most recently, we\u2019ve had 11 different subcontractors [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/\" \/>\n<meta property=\"og:site_name\" content=\"PC Construction\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pcconstructioncareers\" \/>\n<meta property=\"article:published_time\" content=\"2021-05-14T17:06:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-03T15:19:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1432\" \/>\n\t<meta property=\"og:image:height\" content=\"806\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Robert Wierzbicki, Project Director\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Robert Wierzbicki, Project Director\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/\"},\"author\":{\"name\":\"Robert Wierzbicki, Project Director\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/77b0dbc2a0edd90caf5667b744f88486\"},\"headline\":\"Big Changes at WSSC Piscataway Bio-Energy Project\",\"datePublished\":\"2021-05-14T17:06:22+00:00\",\"dateModified\":\"2022-06-03T15:19:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/\"},\"wordCount\":283,\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102.jpg\",\"keywords\":[\"Design-Build\",\"Water \/ Wastewater\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/\",\"url\":\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/\",\"name\":\"Big Changes at WSSC Piscataway Bio-Energy Project - PC Construction\",\"isPartOf\":{\"@id\":\"https:\/\/pcconstruction.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102.jpg\",\"datePublished\":\"2021-05-14T17:06:22+00:00\",\"dateModified\":\"2022-06-03T15:19:13+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#primaryimage\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102.jpg\",\"width\":1432,\"height\":806,\"caption\":\"WSSC Piscataway WRRF Bioenergy Project Tank Construction\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/pcconstruction.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Big Changes at WSSC Piscataway Bio-Energy Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pcconstruction.com\/#website\",\"url\":\"https:\/\/pcconstruction.com\/\",\"name\":\"PC Construction\",\"description\":\"Building Stronger, Together\",\"publisher\":{\"@id\":\"https:\/\/pcconstruction.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pcconstruction.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/pcconstruction.com\/#organization\",\"name\":\"PC Construction\",\"url\":\"https:\/\/pcconstruction.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"contentUrl\":\"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg\",\"width\":1200,\"height\":1200,\"caption\":\"PC Construction\"},\"image\":{\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pcconstructioncareers\",\"https:\/\/www.linkedin.com\/company\/64818\",\"https:\/\/www.youtube.com\/pcconstructionco\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/77b0dbc2a0edd90caf5667b744f88486\",\"name\":\"Robert Wierzbicki, Project Director\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/4c09129eaf5c52f141563434cdeb32166278e65d93ab31ea8de21ecb664bc9d5?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/4c09129eaf5c52f141563434cdeb32166278e65d93ab31ea8de21ecb664bc9d5?s=96&d=mm&r=g\",\"caption\":\"Robert Wierzbicki, Project Director\"},\"url\":\"https:\/\/pcconstruction.com\/news\/author\/rwierzbicki\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Big Changes at WSSC Piscataway Bio-Energy Project - PC Construction","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/","og_locale":"en_US","og_type":"article","og_title":"Big Changes at WSSC Piscataway Bio-Energy Project - PC Construction","og_description":"May is bringing some very visible changes to the landscape of the WSSC Piscataway Water Resource Recovery Facility. The $271 million Bio-Energy Project has been under construction for nearly a year and, with the initial site work complete, several of the project\u2019s structures have started to take shape. Most recently, we\u2019ve had 11 different subcontractors [&hellip;]","og_url":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/","og_site_name":"PC Construction","article_publisher":"https:\/\/www.facebook.com\/pcconstructioncareers","article_published_time":"2021-05-14T17:06:22+00:00","article_modified_time":"2022-06-03T15:19:13+00:00","og_image":[{"width":1432,"height":806,"url":"https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102.jpg","type":"image\/jpeg"}],"author":"Robert Wierzbicki, Project Director","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Robert Wierzbicki, Project Director","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#article","isPartOf":{"@id":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/"},"author":{"name":"Robert Wierzbicki, Project Director","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/77b0dbc2a0edd90caf5667b744f88486"},"headline":"Big Changes at WSSC Piscataway Bio-Energy Project","datePublished":"2021-05-14T17:06:22+00:00","dateModified":"2022-06-03T15:19:13+00:00","mainEntityOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/"},"wordCount":283,"publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102.jpg","keywords":["Design-Build","Water \/ Wastewater"],"articleSection":["Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/","url":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/","name":"Big Changes at WSSC Piscataway Bio-Energy Project - PC Construction","isPartOf":{"@id":"https:\/\/pcconstruction.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#primaryimage"},"image":{"@id":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#primaryimage"},"thumbnailUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102.jpg","datePublished":"2021-05-14T17:06:22+00:00","dateModified":"2022-06-03T15:19:13+00:00","breadcrumb":{"@id":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#primaryimage","url":"https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2021\/05\/WSSC1-e1654269542102.jpg","width":1432,"height":806,"caption":"WSSC Piscataway WRRF Bioenergy Project Tank Construction"},{"@type":"BreadcrumbList","@id":"https:\/\/pcconstruction.com\/news\/big-changes-at-wssc-piscataway-bio-energy-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pcconstruction.com\/"},{"@type":"ListItem","position":2,"name":"Big Changes at WSSC Piscataway Bio-Energy Project"}]},{"@type":"WebSite","@id":"https:\/\/pcconstruction.com\/#website","url":"https:\/\/pcconstruction.com\/","name":"PC Construction","description":"Building Stronger, Together","publisher":{"@id":"https:\/\/pcconstruction.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pcconstruction.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/pcconstruction.com\/#organization","name":"PC Construction","url":"https:\/\/pcconstruction.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/","url":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","contentUrl":"https:\/\/pcconstruction.com\/app\/uploads\/2020\/09\/PC-Logo.jpg","width":1200,"height":1200,"caption":"PC Construction"},"image":{"@id":"https:\/\/pcconstruction.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pcconstructioncareers","https:\/\/www.linkedin.com\/company\/64818","https:\/\/www.youtube.com\/pcconstructionco\/"]},{"@type":"Person","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/77b0dbc2a0edd90caf5667b744f88486","name":"Robert Wierzbicki, Project Director","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pcconstruction.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/4c09129eaf5c52f141563434cdeb32166278e65d93ab31ea8de21ecb664bc9d5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4c09129eaf5c52f141563434cdeb32166278e65d93ab31ea8de21ecb664bc9d5?s=96&d=mm&r=g","caption":"Robert Wierzbicki, Project Director"},"url":"https:\/\/pcconstruction.com\/news\/author\/rwierzbicki\/"}]}},"_links":{"self":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/6603","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/users\/52"}],"replies":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/comments?post=6603"}],"version-history":[{"count":2,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/6603\/revisions"}],"predecessor-version":[{"id":9179,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/posts\/6603\/revisions\/9179"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media\/6604"}],"wp:attachment":[{"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/media?parent=6603"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/categories?post=6603"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pcconstruction.com\/wp-json\/wp\/v2\/tags?post=6603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}